↓
JAVASCRIPT IS DISABLED. Please enable JavaScript on your browser to best view this site.
Search for:
Home
The Project
What is a Neighbourhood Plan ?
Terms of Reference
Production Process
Production Plan
Production timetable
Communication Plan
Finance: Budget and Costs
Meetings
Timetable
Committee Meetings
Minutes
Agenda
Workshop meetings
Neighbourhood Plan
Made version of the Plan (December 2019)
Referendum version of NP (September 2019)
Examiner Questions and Final Report
NDP Summary Document
Superseded Plan (October 2018)
Superseded Plan (September 2017)
Superseded Plan (October 2016)
Public Consultation
Consultation Events
Forthcoming Open Days 2018
Housing Needs Survey 2016
Open Days 16/18 Jan 2016
Results Jan 2016 Open Days
Data Analysis
Survey June 2015
Results June 2015 Survey
Open Day 20 June 2015
Results June 2015 Open Day
Data Analysis
Open Day 10 May 2014
Results May 2014 Open Day
Data Analysis
Gathered Opinions
Housing
Where to Build ?
Where Not to Build ?
Built-up Area Boundary
Site Selection
Size of Developments
Style and Type of New Homes
Green Spaces
Fingers, Corridors and Individual Spaces
Green Space Designation
Call for Sites
Sites Submission Process
Sites Offered
Selecting sites – how do we choose?
Proposed Development Sites
Reference Material
Housing Allocations
Reference Documents
Past Brailes Surveys
Core Strategy Assessments
Landscape Sensitivity Assessment
Built-up Area Boundary
Strategic Environment Assessment
Statutory Protection
Listed Buildings
Conservation Areas
Scheduled Monument
AONB
Footpaths and Bridleways
About Us
The Team
Contact Addresses
Home
→
NDP Summary Document
Log in
NDP Summary Document
NDP Summary Document
NDP summary document
↑
Do NOT follow this link or you will be banned from the site!